Central Hall Sanding
- Client: Westminster Central Hall – a landmark building in central London.
- Brief: To strip, sand & seal original wood block floors in main corridors, lobbies , Cafeteria and the Great Hall.
Work to be carried out whilst examinations were being held so noise, dust and disruption had to be kept to a minimum.
- Completion: Over 1,500 metres successfully sanded and lacquered within the ten day period.

This entry was posted onSaturday, November 5th, 2011 at 12:13 pm and is filed under contracts portfolio, Portfolio, Portfolio Sanding And Sealing. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site. Both comments and pings are currently closed.




