New Oak Floor For School
- Client: Preparatory School in North London.
- Brief: Following a major flood, the wood floor, underlay and sub floor had to be lifted and removed from site and a new floor installed within a 5 day period to enable the classroom to be used.
- Completion: A liquid epoxide high performance waterproof membrane was installed on the surface of the concrete sub floor to suppress the moisture. An engineered Oak stripwood floor was installed well within the allotted time.
This entry was posted onMonday, November 7th, 2011 at 2:13 pm and is filed under contracts portfolio, Portfolio, Portfolio Hardwood Floors. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site. Both comments and pings are currently closed.