Navigation Menu+

Over 160 Metres Of Linoleum Laid In A North London Medical Practice

  • Client: Over 160 Metres Of Linoleum Laid In A North London Medical Practice.
  • The brief: To remove stuck down carpet throughout the waiting & reception areas, corridors and consulting rooms and replace with an ecological and bacteria resistant product.
  • The solution: Existing stuck down carpets were stripped up, new ply installed and a feather screed applied to cover the joints and screw holes. Sheet lino was then stuck down throughout, the joints welded and the perimeter sealed with clear silicone sealant.