Over 160 Metres Of Linoleum Laid In A North London Medical Practice
- Client: Over 160 Metres Of Linoleum Laid In A North London Medical Practice.
- The brief: To remove stuck down carpet throughout the waiting & reception areas, corridors and consulting rooms and replace with an ecological and bacteria resistant product.
- The solution: Existing stuck down carpets were stripped up, new ply installed and a feather screed applied to cover the joints and screw holes. Sheet lino was then stuck down throughout, the joints welded and the perimeter sealed with clear silicone sealant.
This entry was posted onWednesday, November 2nd, 2011 at 3:10 pm and is filed under contracts portfolio, Portfolio, Portfolio Smooth Floors. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site. Both comments and pings are currently closed.




